The Return of the Mast.

April 2020, yes, 5 months later. All Winter we tinkered on Sea Bella’s mast, which layed horizontally on sawhorses in our backyard. Scott installed stainless steel strengtheners inside the masts’ furling track every 10 inches. He also installed all new halyards, sheaves, wiring, LED lights, weather station, vhf antennae, radar mount, and rigging.

One thought on “The Return of the Mast.

Leave a Reply